Table of Contents
PERMODELAN PROPORSI SDM, MATERIAL DAN ALAT PADA PROYEK KONSTRUKSI GEDUNG SEDERHANA & NON SEDERHANA
DOI : 10.32528/hgn.v3i1.2174
Rini Pebri Utari, Ernawan Setyono
|
|
OPTIMASI KONTRUKSI BENDUNG TYROL BATANG SARING DENGAN MENGGUNAKAN JARINGAN SYARAF TIRUAN
DOI : 10.32528/hgn.v3i1.2906
Iim Nur Imama, Noor Salim, Ari Eko Wardoyo
|
|
EVALUASI KEBUTUHAN LAHAN PARKIR OFF STREET PARKING DI PASAR TANJUNG JEMBER
DOI : 10.32528/hgn.v3i1.2907
Arik Sebastian, Totok Dwi Kurniawan, Irawati Irawati
|
|
PERENCANAAN ALTERNATIF JALAN BEBAS HAMBATAN DENGAN FLEXIBLE PAVEMENT METODE BINA MARGA 2013 DAN RENCANA ANGGARAN BIAYA TOL PASURUAN – PROBOLINGGO KM 3 – KM 10
DOI : 10.32528/hgn.v3i1.2908
Ahmad Gufron, Irawati Irawati, Taufan Abadi
|
|
EVALUASI PEREMPATAN JALAN MASTRIP BARAT, KALIMANTAN, MASTRIP TIMUR, DAN DANAU TOBA
DOI : 10.32528/hgn.v3i1.2909
Ach Robit Robit, Totok Dwi Kurniawan, Irawati Irawati
|
|
KINERJA PARKIR DAN TINGKAT KEPUASAN PENGGUNA JASA LAHAN PARKIR PADA STASIUN KERETA API RAMBIPUJI (DAOP IX JEMBER)
DOI : 10.32528/hgn.v3i1.2910
Fadhil Aditya Putra Vidiyanto, Amri Gunasti, Irawati Irawati
|
|