Penentuan Kapasitas Transformator Sisip Untuk Mengatasi Beban Lebih Pada ULP Merduati Kota
Abstract
Keywords
Full Text:
PDF (Bahasa Indonesia)References
I. M. A. Nugraha and I. G. M. N. Desnanjaya, “Penempatan Dan Pemilihan Kapasitas Transformator Distribusi Secara Optimal Pada Penyulang Perumnas,” J. Resist. (Rekayasa Sist. Komputer), vol. 4, no. 1, pp. 33–44, 2021, doi: 10.31598/jurnalresistor.v4i1.722.
E. Ediwan, M. Muliadi, M. Mahalla, N. Nazaruddin, and A. Mulkan, “The Reconfiguration of Network at 20 kV Distribution System Nagan Raya Substation with the Addition of the Krueng Isep Hydroelectric Power Plant,” J. Nas. Tek. Elektro, vol. 10, no. 2, 2021, doi: 10.25077/jnte.v10n2.888.2021.
Muliadi and Aswijar Jamal, “Analisa Keandalan Sistem Distribusi Berdasarkan Indeks SAIFI, SAIDI, dan CAIDI Pada Penyulang Suak Ribee ULP. Meulaboh Kota,” Ajeetech, vol. 2, no. 1, pp. 14–18, 2022.
Kasmawan, Syukri, and Muliadi, “Studi Pengaruh Pembebanan Lebih Pada Trafo Distribusi Di GH. Merduati Banda Aceh,” Aceh J. Electr. Eng. Technol., vol. 2, no. 2, pp. 24–28, 2022.
M. Muhammad, S. Meliala, and D. Damayanti, “Mengatasi Beban Lebih Transformator Gardu Distribusi Dengan Menggunakan Trafo Sisip Di PT PLN (Persero) ULP Langsa Kota,” J. Energi Elektr., vol. 11, no. 1, pp. 26–29, 2022, doi: 10.29103/jee.v11i1.7735.
N. M. Seniari, M. N. Fadli, and I. M. Ginarsa, “Analisis Rencana Pemasangan Transformator Sisipan Pada Saluran Transformator Distribusi Penyulang Pagutan (Studi Kasus: Transformator Distribusi AM097 Di Jalan Banda Seraya, Pagesangan, Kota Mataram),” Dielektrika, vol. 7, no. 1, pp. 56–63, 2020, doi: 10.29303/dielektrika.v7i1.226.
P. Harahap, M. Adam, and A. Prabowo, “Analisa Penambahan Trafo Sisip Sisi Distribusi 20 Kv Mengurangi Beban Overload Dan Jutah Tegangan Pada Trafo Bl 11 Rayon Tanah Jawa Dengan Simulasi Etab 12.6.0,” RELE (Rekayasa Elektr. dan Energi) J. Tek. Elektro, vol. 1, no. 2, pp. 62–69, 2019, doi: 10.30596/rele.v1i2.3002.
M. A. Auliq and I. B. Pratama, “Analisa Penentuan Estimasi Jarak Gangguan pada Sistem Distribusi Menggunakan Metode ETAP 12 . 6 . 0,” vol. 3, pp. 31–42, 2021.
S. Syukri, T. M. Asyadi, M. Muliadi, and F. Moesnadi, “Analisa Pembebanan Transformator Distribusi 20 kV Pada Penyulang LS5 Gardu LSA 249,” Jambura J. Electr. Electron. Eng., vol. 4, no. 2, pp. 202–206, 2022, doi: 10.37905/jjeee.v4i2.14500.
Fauzi, Subhan, Muliadi, Syukri, T. M. Asyadi, and A. S. Budi, “Analisis Tingkat Keandalan Pada Jaringan Express Feeder SUTM A3CS Sebagai Incoming Baru,” vol. 5, no. 1, pp. 48–54, 2023.
Jeckson, A. Prayuda, and Y. Afrida, “Analisis Dampak Overload Transformator Terhadap Kualitas Daya Gardu K622 Penyulang Pelangi PT. PLN (Persero) ULP Karang,” J. Ilm. Tek. Elektro, vol. 4, no. 1, pp. 10–12, 2022.
K. W. Widiatmika, I. W. A. Wijaya, and I. N. Setiawan, “Analisis Penambahan Transformator Sisipan Untuk Mengatasi Overload Pada Transformator DB0244 Di Penyulang Sebelanga,” Spektrum, vol. 5, no. 2, pp. 19–25, 2018.
DOI: https://doi.org/10.32528/elkom.v5i2.11051
Refbacks
- There are currently no refbacks.
Copyright (c) 2023 Jurnal Teknik Elektro dan Komputasi (ELKOM)
This work is licensed under a Creative Commons Attribution 4.0 International License.
View My Status Indexing Service
Publisher : | Editorial Address : |